Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2009 | GRADING - FINAL | Approved | ||
| 06/03/2009 | GRADING - FINAL | Correction Required | MALENA CARREON AND I MET ON SITE WITH MIKE LANDAU CONTRACTOR NEEDS TO COMPLETE ALL SITE WORK PER APPROVED PLAN. 1)ADDRESS GRATE ON S/S ENTRANCE 2) STABILIZE ALL DISTURBED AREAS 3) ENGINEER NEEDS TO CERTIFY BOTH BASINS 4) COMPLETE WATER HAVRESTING AREAS ON S/S OF BLDG. TO PREVENT WATER FROM CROSSING SIDE WALK 5) REMOVE ALL CONSTRUCTION DEBRIS FROM PUBLIC AREAS 6) SWEEP AND REMOVE TRACKOUT FROM PARKING LOTS AND BAY COLONY DRIVE. REF. T07BU00618 |
|
| 10/13/2008 | GRADING - FINAL | Correction Required | Contractor needs to install SWPPP controls and stabilize all areas outside grading limits that have been disturbed. Also need to maintain 24' PAAL's. |