Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU00615
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/07/2008 | STORMWATER FOLLOW-UP INSP | Approved | ||
01/31/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
11/06/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | PREVIOUS CORRECTIONS HAVE BEEN MADE. SITE IS DUSTY - WATER DOWN SITE TO CREATE A CRUST AND CONTROL DUST AT ALL TIMES. |
|
10/29/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REPAIR SILT FENCE AT NORTH SIDE OF SITE. 2. CLEAN OUT CONCRETE WASH OUT AREA. 3. RE-DEFINE BERM AT WEST PERIMETER AND REMOVE MATERIAL FROM BERM. CLOSE ALL BREECHES. |
|
09/17/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO STORMWATER CONCERNS PLEASE MAINTAING CONCRETE WASHOUT AREAS |
|
09/04/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS SWEEP DRIVEWAY BETWEEN THE NEW PARKING LOTS AS NEEDED TO PREVENT TRACKOUT TO CARONDOLET. |
|
08/27/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1-3. SEE NOTES 4,5, AND 6 OF 8/17/07 INSPECTION REPORT. 4. PROVIDE ADDDITIONAL ROCK AT EAST PARKING LOT SCE. 5. REPAIR SILT FENCE AT EAST PARKING LOT SW CORNER. |
|
08/20/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTIONS ARE IN PROGRESS. cOMPLETE ITEMS 4,5 AND 6 OF PREVIOUS INSPECTION AND PROVIDE ROCK AT CONSTRUCTION ENTRANCE OF EAST PARKING LOT. | |
08/17/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SUFFICIENT SWPPP COMPLIANCE HAS BEEN MET TO FORGO STEPPED UP ENFORCEMENT AT THIS TIME. 1. LOWER ROCK AT NORTH OUTFALL TO FLUSH CONDITION WITH OUTLET. PROVIDE SWPPP CONTROLS AT OUTLET. 2. SWEEP NORTH PARKING LOT/RD BASIN. 3. PROVIDE GRAVEL AT BREECH IN SWPPP CONTROLS/DRIVEWAY NEAR NW CORNER OF SITE. 4. ADDRESS WITH ENGINEER OF RECORD THE NORTH R/D BASIN OUTLET SIZE AND CAPACITY. 5. PROVIDE A COPY OF THE SWPPP FOR THE INSPECTOR. 6. PROVIDE A NEW COPY OF THE SWPPP DRAWING WITH ALL UPDATED INFORMATION. 7. GUY SHOAF TO PROVIDE A COPY OF THE PLAN FOR THE EASTERNMOST TEMPORARY PARKING LOT. ENGINEER OF RECORD IS BOB TENOR/EEXC |
|
08/06/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. DEVELOP AND IMPLEMENT A CORRECTIVE ACTION PLAN TO ACHEIVE TOTAL COMPLIANCE WITH STORM WATER REGULATIONS. 2. VERIFY THAT ALL SWPPP CONTROLS HAVE BEEN INSTALLED CORRECTLY AND WILL PROVIDE ADEQUATE CONTROL NOTE: I VERBALLY REQUESTED A COPY OF THE APPROVED GRADING PLAN AND THE SWPPP. |
|
08/03/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED FOR COMPLIANCE WITHIN (7) DAYS BEFORE A NOTICE OF VIOLATION, CITATIONS AND A STOP WORK ORDER ARE ISSUED. NOTE: SWPPP CONTROLS DAMAGED BY 0.50" RAINFALL MUST BE REPAIRED WITHIN 24 HOURS OR BEFORE THE NEXT RAIN EVENT. 1. REPAIR ALL DAMAGED SWPP CONTROLS. 2. PROVIDE ADDITIONAL ROCK ON STABILIZED CONSTRUCTION ENTRANCE. 3. CONSTRUCT R/D BASINS WITH VOLUMES AS SHOWN ON THE GRADING PLAN. 4. PROVIDE A CONCRETE WASHOUT AREA. 5. REMOVE SEDIMENT ACCUMALATION AT SWPP CONTROLS (PAGE 13). 6. REMOVE SEDIMENT FROM DE-SILTING BASINS ON AND OFF SITE (PAGE 13). 7. PROVIDE A SUBSTANTIAL (COMPACTED) BERM ON WEST PERIMETER (PAGE 12). 8. PROVIDE PROPER STORAGE FOR ALL ON-SITE MATERIAL (WM-1) 9. STORE METAL OFF THE GROUND, PROTECT HAZARDOUS MATERIALS FROM RAINWATER. SUPERINTENDENT WAS NOT AVAILABLE DURING INSPECTION. THIS NOTICE WAS LEFT IN THE CONTRACTOR'S TRAILER ON THE SUPERINTENDENT'S NOTE BOOK. |
|
08/02/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | I INFORMED JIM FEY THAT STORMWATER CONTROLS NEED MAINTAINANCE AND ALL SEDIMENT MUST BE CONTAINED ON SITE. |