Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T07BU00558
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/16/2009 | GRADING - INTERMEDIATE | Approved | ||
03/23/2009 | GRADING - INTERMEDIATE | Continued | SITE PAVED, RET/DET BASIN ROUGHED - IN. CONTRACTOR HAS AN APPROVED REVISED SITE PLAN. ALL SITE WORK NOT COMPLETED. NEED BASIN CERT FROM EOR. |
|
03/16/2009 | GRADING - INTERMEDIATE | Continued | ADDITIONAL CHANGES MADE TO THE PLANS NOT MENTIONED DURING THE PREVIOUS INSPECTION OR DURING THE CONVERSATION WITH THE ARCHITECH. CONTRACTOR NEEDS A REVISED PLAN SHOWING ALL CHANGES MADE THAT HAS BEEN APPROVED BY THE ENG. OF RECORD AND THE CITY OF TUCSON. | |
03/10/2009 | GRADING - INTERMEDIATE | Continued | NO RESPONSE ON REVISED PLAN SHOWING CHANGES MADE. SITE WORK NOT COMPLETED. NO STORM WATER CONCERNS AT THIS TIME. |
|
02/18/2009 | GRADING - INTERMEDIATE | Correction Required | CONTRACTOR WILL PROVIDE AN APPROVED REVISED SITE/GRADING PLAN FROM THE ENGINEER OF RECORD SHOWING ALL CHANGES MADE TO THE ORIGINAL APPROVED PLAN. | |
02/06/2009 | GRADING - INTERMEDIATE | Continued | APPROVED SITE PLAN AND GRADING PLAN DO NOT MATCH. ALL SITE DETAILS AND NOTES ARE NOT SHOWN ON THE APPROVED GRADING PLAN. PROPOSED CHANGES BY CONTRACTOR/DEVELOPER INCLUDE: MOVE LOCATION OF WATER HARVESTING BASIN HEIGHT OF CURBS ALONG NORTH SIDE NOT CLEAR OF LOCATION OF TERMINATION POINT OF ROOF DRAINS STORM WATER CISTERNS MAY BE REMOVED FROM SITE PLAN ANY AND ALL SIGNIFICANT CHANGES TO THE APPROVED SITE/GRADING PLAN MUST BE REVISED BY THE ENG OF RECORD AND THE CITY OF TUCSON. |
|
09/18/2008 | GRADING - INTERMEDIATE | Correction Required | SPOKE W/ARCHITECH FROM DOWEL ENGINEERING. OWNER MADE CHANGES TO APPROVED PLANS. MAY NEED REVISION. |
|
09/16/2008 | GRADING - INTERMEDIATE | Partial Approval | SITE HAS BEEN ROUGH GRADED, SOME SITE CONSTRUCTION BEING ACCOMPLISHED, NO SWPPP REQUIRED. WILL MEET WITH SUPER AND ENGINEER ON WED 9/17/08 |