Permit: T07BU00553

Parcel: 13507444E


Addresses:

1551 S EASTSIDE LP


Inspection Status: Correction Required

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T07BU00553

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Correction Required

Date Description Inspector Results Comments
11/25/2008 STORMWATER FOLLOW-UP INSP Correction Required NO CONSTRUCTION FENCE IN PLACE

NO ASPHALT --- NO LEASING SIGN IS UP
09/23/2008 STORMWATER FOLLOW-UP INSP Correction Required CONTROLS STILL IN NEED OF MAINTENANCE
06/25/2008 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE
MAINTENANCE STILL NEEDED
06/09/2008 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE
06/04/2008 STORMWATER FOLLOW-UP INSP Correction Required CONTROLS IN NEED OF MAINTENANCE
05/13/2008 STORMWATER FOLLOW-UP INSP Correction Required CONTROLS IN NEED OF MAINTENANCE
04/21/2008 STORMWATER FOLLOW-UP INSP Correction Required CONTROLS IN NEED OF MAINTENANCE
03/11/2008 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT ONTO EASTSIDE LOOP
02/04/2008 STORMWATER FOLLOW-UP INSP Correction Required CONTROLS NEED MAINTENANCE ALONG EASTSIDE LOOP
01/15/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CHANGE IN SITE
11/27/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CHANGE IN SITE
11/16/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CHANGE IN SITE
10/24/2007 STORMWATER FOLLOW-UP INSP Correction Required Met with Paul Amanti on site to discuss correction notice. He has completed all items on notice however the SWPPP controls were not installed correctly, waddle not satked or set in ground and not installed in the proper location. I gave him until the end of day on 10/25 to repair.
10/24/2007 STORMWATER FOLLOW-UP INSP Violation DROVE BY SITE 11 AM
WATTLE NOT INSTALLED PROPERLY
NO OTHER ACCESS TO SITE
10/19/2007 STORMWATER FOLLOW-UP INSP Violation 11 AM INSPECTION
SEE PICS 2801-2822
NOT CP 1 PLACE SEDIMENT CONTROLS PER SWPPP PLAN
NOT CP 2 PLACE CONTROLS AT CURB CUT LOCATIONS
NOT CP 3 SWEEP STREET/TRACK OUT
CP 4 CLOSE WEST ENTRANCE OR PLACE ROCK FOR STABILIZED CONSTRUCTION ENTRANCE
PARTIALLY CP 5 REMOVE DIRT FROM SOUTH PARKING LOT AREA (OFF SITE)
PARTIALLY CP 6 PICK UP ALL CONSTRUCTION DEBRIS/FLOATABLES
PARTIALLY CP 7 CLEAN UP ALL MATERIALS AND STORE PROPERLY INCLUDING PAINT BUCKET SOUTH OF DUMPSTER
NOT ON SITE 8 UPDATE ALL SWPPP LOGS AND HAVE AVAILABLE FOR NEXT INSPECTION 10/19/07

NOT CP-PLACE SEDIMENT CONTROLS AT CURB CUT
PARTIALLY CP-CLEAN UP ALL WASHOUT AND ENSURE DESIGNATED WASHOUT USE

9/28 INSPECTION
CP-PERFORM MAINTENANCE ON CONCRETE WASHOUT
PARTIALLY CP-CONTAIN ALL CONSTRUCTION DEBRIS
10/16/2007 STORMWATER FOLLOW-UP INSP Violation MET ON SITE WITH PAUL AMANTI AND JIM FEMLING

3 DAYS FOR COMPLIANCE OR STOP WORK AND/OR CITATION
REINSPECT 10/19 3 PM CONTACT PAUL AMANTI AT 631-2413

1 PLACE SEDIMENT CONTROLS PER SWPPP PLAN
2 PLACE CONTROLS AT CURB CUT LOCATIONS
3 SWEEP STREET/TRACK OUT
4 CLOSE WEST ENTRANCE OR PLACE ROCK FOR STABILIZED CONSTRUCTION ENTRANCE
5 REMOVE DIRT FROM SOUTH PARKING LOT AREA (OFF SITE)
6 PICK UP ALL CONSTRUCTION DEBRIS/FLOATABLES
7 CLEAN UP ALL MATERIALS AND STORE PROPERLY INCLUDING PAINT BUCKET SOUTH OF DUMPSTER
8 UPDATE ALL SWPPP LOGS AND HAVE AVAILABLE FOR NEXT INSPECTION 10/19/07
10/11/2007 STORMWATER FOLLOW-UP INSP Violation NOTICE OF VIOLATION ISSUED 10/05/07
REFEE CHARGED
SEE PICS 2759-2782

ITEMS FROM 9/20 INSPECTION NOT ADDRESSED
NOT CP-PLACE SEDIMENT CONTROLS AT CURB CUT
NOT CP-CLEAN UP ALL WASHOUT AND ENSURE DESIGNATED WASHOUT USE

9/28 INSPECTION
NOT CP-PERFORM MAINTENANCE ON CONCRETE WASHOUT
NOT CP-CONTAIN ALL CONSTRUCTION DEBRIS
10/05/2007 STORMWATER FOLLOW-UP INSP Violation PICS 2731-2753

3 DAYS TO CORRECT OR 3RD $75 REINSPECT FEE

ITEMS NOT ADDRESSED FROM 9/20 INSPECTION:

-PLACE SEDIMENT CONTROLS AT CURB CUT
-CLEAN UP ALL WASHOUT AND ENSURE DESIGNATED WASHOUT USE

9/28 INSPECTION
-PERFORM MAINTENANCE ON CONCRETE WASHOUT
-CONTAIN ALL CONSTRUCTION DEBRIS
MAILED NOTICE TO 1660 S RESEARCH LP STE 146 REGULAR AND CERTIFIED
09/28/2007 STORMWATER FOLLOW-UP INSP Correction Required PICS 2660-2679
3 DAYS TO CORRECT OR 2ND $54 REINSPECT FEE

ITEMS NOT ADDRESSED FROM 9/20 INSPECTION:
-POST AZPDES PER PERMIT REQMNTS
-PLACE SEDIMENT CONTROLS AT CURB CUT
-CLEAN UP ALL WASHOUT AND ENSURE DESIGNATED WASHOUT USE

9/28 INSPECTION
-PERFORM MAINTENANCE ON CONCRETE WASHOUT
-CONTAIN ALL CONSTRUCTION DEBRIS

HAND DELIVERED NOTICE TO 1660 S RESEARCH LP STE 146
09/20/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS TO REFEE REINSPECT 9/27/07
PICS 2657-2659
-POST AZPDES PER PERMIT REQMTS
-PLACE SEDIMENT CONTROLS @ CURB CUT
-CLEAN UP ALL WASHOUT AND ENSURE WASHOUT USE

REINSPECT SCHD FOR 9/27 REINSPECT FEE $54
09/06/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 5 DAYS
STOCKPILES NOT PROTECTED
SCE (ROCK) NEEDS TO BE PLACED AT CURB CUT LOCATIONS OR OTHER BMP
UNCONTAINED CONSTRUCTION DEBRIS
07/26/2007 STORMWATER FOLLOW-UP INSP Continued WOOD RAMPS IN RIGHT OF WAY
NO SITE ACCESS
GRADING PLAN HAS NOT BEEN RESUBMITTED
STILL WORKING WITHOUT A GRADING PLAN
07/05/2007 STORMWATER FOLLOW-UP INSP Continued CURB CUT HAS NOT BEEN MADE
BOARDS WERE PLACED IN GUTTER LINE TO FACILITATE INGRESS/EGRESS
DUMPSTER IS FULL/OVER FULL
CONCRETE DEBRIS IS STILL ON SITE AND NOT PROTECTED
06/19/2007 STORMWATER FOLLOW-UP INSP Violation SEE PICS 2409-2415
STOP WORK HAS BEEN ISSUED
06/06/2007 STORMWATER FOLLOW-UP INSP Violation NOTICE OF VIOLATION
SENT NOTICE OF VIOLATION 3 DAYS FOR CORRECTION
DIRT NOT REMOVED FROM ROADWAY AFTER 6 NOTICES
06/06/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS
-POST GREEN SHEET (FILLED OUT) 3RD COPY PROVIDED
-CLEAN UP ALL UNCONTAINED WASH OUT
-PLACE SEDIMENT CONTROLS AROUND STOCKPILE
-MAINTAIN CONCRETE WASHOUT
-PLACE ALL CONSTRUCTION DEBRIS AND GARBAGE IN DUMPSTER OR OTHER CONTROLLED AREA
-PROVIDE A BERMED AREA AT MORTAR MIXER
06/05/2007 STORMWATER FOLLOW-UP INSP Violation DIRT RAMP STILL NOT REMOVED SEE PICS 2304-2313
06/01/2007 STORMWATER FOLLOW-UP INSP Correction Required DIRT RAMP STILL NOT REMOVED FROM ROADWAY
PLACE CONCRETE WASHOUT AND SIGN IT ON SITE
04/26/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 5 DAYS

REMOVE DIRT RAMP FROM ROADWAY-LAST NOTICE
POST ADDRESS AND GREEN AZPDES POSTING (PROVIDED)
CLEAN UP UNCONTAINED WASH OUT
PLACE CONCRETE, MORTAR, STUCCO, PAINT WASHOUT

NOTICE OF VIOLATION NEXT STEP

SEE PICS 2167-2177