Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2009 | GRADING - FINAL | Approved | Info provided. | |
| 01/23/2009 | GRADING - FINAL | Partial Approval | SITE UNCHANGED FROM LAST INSPECTION | |
| 11/13/2008 | GRADING - FINAL | Partial Approval | PROVIDE GEO TECH LETTER FOR SLOPE TREATMENT (RIP RAP) | |
| 12/14/2007 | GRADING - FINAL | Correction Required | Contractor needs to: 1- Sweep Street. 2- Clean wash out front of house. 3- Need to meet on site to go over slope bank treatment. Spoke to Jerry on site. |
|
| 11/06/2007 | GRADING - FINAL | Partial Approval | Contractor cleaned site. | |
| 10/05/2007 | GRADING - FINAL | Correction Required | Contractor needs to address slope bank and clean street. | |
| 08/13/2007 | GRADING - FINAL | Correction Required | Contractor needs to sweep streets. | |
| 07/26/2007 | GRADING - FINAL | Not ready for Inspection | Spoke to contractor in regards to keeping all construction activity out of detention basin. |