Inspection History Details
Inspection Status: Partial Approval
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2008 | GRADING - INTERMEDIATE | Partial Approval | ASPHALT AND STRIPING COMPLETE VISUAL INSPECTION ONLY |
|
| 08/20/2008 | GRADING - INTERMEDIATE | Partial Approval | MET WITH RON ON SITE DISCUSSED H/C PARKING-CLOSE TO 2% AT SUBGRADE CAUTIONED PAVING CONTRACTOR H/C PARKING SPACES MUST BE MAX OF 2% AND ACCESSIBLE ROUTE MAX 5% |
|
| 08/19/2008 | GRADING - INTERMEDIATE | Partial Approval | SUB GRADE BEING PREPPED FOR PAVING | |
| 07/30/2008 | GRADING - INTERMEDIATE | Partial Approval | VERIFIED ON SITE SIDWALK W/I 5% FOR ACCESSIBLE ROUTE LOOKED AT OTHER SITE WORK PAVING NOT YET STARTED |
|
| 07/11/2008 | GRADING - INTERMEDIATE | Partial Approval | NO NEW SITE WORK | |
| 06/26/2008 | GRADING - INTERMEDIATE | Partial Approval | VERTICAL WORK CONTINUING SITE WORK CONTINUING MET WITH RON THOMAS AND OWNER ON SITE. SLOPES ARE NOT THE SAME AS PLAN-RIP RAP IS NOT NECESSARY DUE TO FLATTER SLOPE-DG IS ACCEPTABLE PER LUC FOR STABILIZATION AS LONG AS SPLASH PADS/BLOCKS ARE PLACED AT ROOF DRAINS TO PREVENT EROSION. DISCUSSED TRASH ENCLOSURE DOORS-THEY MUST PREVENT DEBRIS AND REFUSE FROM LEAVING ENCLOSURE AREA BIKE RACK LOCATION CAN CHANGE SOMEWHAT IN ORDER TO BETTER ALLOW FOOT TRAFFIC |
|
| 04/16/2008 | GRADING - INTERMEDIATE | Partial Approval | PADS POURED RETAINING WALL AT EAST SIDE CP SITE WORK STILL BEING DONE |
|
| 04/04/2008 | GRADING - INTERMEDIATE | Partial Approval | CONCRETE TRUCKS ON SITE POURING PADS | |
| 04/03/2008 | GRADING - INTERMEDIATE | Partial Approval | PAD FORM BOARDS UP | |
| 03/25/2008 | GRADING - INTERMEDIATE | Partial Approval | SITE ROUGH GRADED PAD WORK APPEARS TO BE STARTED |
|
| 03/21/2008 | GRADING - INTERMEDIATE | Partial Approval | SCE INSTALLED | |
| 03/20/2008 | GRADING - INTERMEDIATE | Partial Approval | UTILITY TRENCHES ARE BACKFILLED | |
| 07/11/2007 | GRADING - INTERMEDIATE | Partial Approval | MET WITH PAUL FOR CLARIFICATION ON PLANS |