Inspection Status: Correction Required
Inspection History: GRADING - CHECK FOR ACTIVITY
| Date |
Description |
Inspector |
Results |
Comments |
| 01/20/2009 |
GRADING - CHECK FOR ACTIVITY |
|
Correction Required |
No activity on site. |
| 03/21/2008 |
GRADING - CHECK FOR ACTIVITY |
|
Not ready for Inspection |
Contractor needs to call in final inspection. |
| 02/15/2008 |
GRADING - CHECK FOR ACTIVITY |
|
Correction Required |
Contractor needs to remove material from street. Spke to site super in regards to. |
| 10/05/2007 |
GRADING - CHECK FOR ACTIVITY |
|
Not ready for Inspection |
No concerns at this time. |