Inspection History Details
Inspection Status: Continued
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2011 | GRADING - FINAL | Continued | NO ACTIVITY AT THIS TIME. STOCPILES ON SITE. GATE LOCKED | |
| 01/09/2009 | GRADING - FINAL | Correction Required | Contractor starting to stockpile material on site. | |
| 04/22/2008 | GRADING - FINAL | Partial Approval | Slope ranges from 2 to 1 to 3 to 1. | |
| 04/18/2008 | GRADING - FINAL | Partial Approval | Contractor addressed items from notice of violation. Still need to stabilize all areas disturbed by construction. | |
| 04/17/2008 | GRADING - FINAL | Correction Required | Issued Notice of Violation, Contractor needs to address: 1- Wash out next to west entrance. Sec. 26-40.5. 2- North slope bank steeper then 1to1. D.S. 11-01.7.2. 3- Grading on property to the north. D.S. 11-012.1.B. 4- Stabilize all areas disturbed by construction. Sec 26-40.2 and 5. and LUC 3.7.2.7. Contractor has one day to address. If items are not addressed I will issue a stop work order. Spoke to Jorge site super. |
|
| 04/10/2008 | GRADING - FINAL | Correction Required | Issued Correction Notice. Contractor needs to address: 1- Address side slope on north and west side of building. (stabilize) *2- Provide approved site/grading plan. *3- Provide 2' setback on north side slope. Per D.S. 11-01.9.3. *4- Remove material from right-of-way and property to the north. 5- Have all changes to plans approved. *6- Contact Andy Vera (791-5543, X1212) for approval of trash enclosure. 7- Contractor needs to maintain ADA access from building to right-of-way. Spoke to Joe site super in regards to items. If items are not addressed in 7 days I will issue a Stop Work Order. Items with * need to be completed before re-inspect. |
|
| 12/27/2007 | GRADING - FINAL | Correction Required | Contractor working outside grading limits. Pull all material back within grading limits. Complete all work per approved grading plan and D.S. 11-01. |