Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU00366
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/09/2009 | STORMWATER FOLLOW-UP INSP | Approved | ALL SITE WORK IS COMPLETED | |
02/10/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | MUD ON PAVEMENT NEEDS TO BE CLEANED UP. SEDIMENT CONTROL AT OUTFALL WILL HOLD MUD ON SITE. | |
11/21/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. STRAW WATTLE AT THE INLET TO THER/D BASIN MUST BE SECURED TO PREVENT FLOTATION AND PROVIDE SEDIMENT CONTROL. 2. CLEAN UP AND REMOVE ALL WASHOUT/SEDIMENT FROM THE R/D BASIN. 3. PROVIDE A DESIGNATED WASHOUT AREA. |
|
10/10/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE SWPPP INLET CONTROL AT OUTFALL | |
10/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE SWPPP INLET CONTROL AT OUTFALL | |
04/21/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | SILT BARRIER NEEDED TO PREVENT FLOW AROUND SIDES OF OUTLET STRUCTURE. | |
04/07/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
03/11/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | ||
03/04/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | MAINTAIN STABILIZED CONSTRUCTION ENTRANCE AND PROVIDE ADDITIONAL GRAVEL. | |
12/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
12/10/2007 | STORMWATER FOLLOW-UP INSP | Cancelled | ||
12/03/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. COMPACT SOIL AT STRAWBALE TO BERM TRANSITION. 2. UPDATE SWPPP DRAWING AND DOCUMNENTS IN BOOK. 3. PROVIDE APPROVED DRAWING FOR 3' DIKE REVISION. 4. REPAIR BREECHES AT PERIMETER SWPPP CONTROLS DUE TO BREAK THROUGH BY 11/30-12/1 RAIN EVENT. 5. CLEAN UP ALL CEMENT AND CONCRETE WASHOUT NOT IN DESIGNATED AREA. |
|
11/26/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. COMPACT SOIL AT STRAWBALE TO BERM TRANSITION. 2. UPDATE SWPPP DRAWING AND DOCUMNENTS IN BOOK. 3. PROVIDE APPROVED DRAWING FOR 3' DIKE REVISION. |
|
11/19/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. COMPACT SOIL AT STRAWBALE TO BERM TRANSITION. 2. CONSTRUCT 3' GROUTED RIP RAP DIKE ON NORTH PERIMETER TO MAINTAIN THE INTEGRITY OF THE EXISTING WALL. ADAM (480) 695-9400 (520) 320-1000 OFFICE |
|
09/25/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE ADDITIONAL SOIL FROM IN FRONT OF STRAWBALE OUTFALL TO PROVIDE A SEDIMENTATION BASIN. 2. BUILD THE BERM TO THE STRAWBALE OUTFALL. 3. PROVIDE A CONCRETE WASH OUT AREA . 4. WATER DOWN THE SITE TO CONTROL DUST. |
|
09/17/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. RE-LOCATE STABILIZED CONSTRUCTION ENTRANCE AND PROVIDE 30' X 50' OF 1-3" GRAVEL 3-6" DEEP. 2. SWEEP TRACKED SOIL FROM PAVEMENT ON GRANT. 3. REMOVE SEDIMENT IN FRONT OF STRAW BALES. 4. TIE IN THE PERIMETER BERM TO THE STRAWBALE OUTFALL. |