Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU00352
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/07/2015 | STORMWATER FOLLOW-UP INSP | Approved | ||
12/18/2012 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | NO CONCERNS AT THIS TIME. | |
10/02/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
11/02/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. SOME DEBRIS NOTED IN THE STREETS AND WITHIN THE BASIN THAT NEED TO BE REMOVED. | |
01/04/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
03/23/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
02/09/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME. CONTRACTOR WORKING ON CONSTRUCTION OF HOUSES AT VARIOUS LOTS, INFRUSTRUCTURE IS COMPLETE. |
|
01/29/2010 | STORMWATER FOLLOW-UP INSP | Continued | ALL GRADING ISSUES AND CONCERNS WILL BE ADDRESSED UNDER PERMIT #T07BU00352. MOST SITE WORK COMPLETED, SOME MINOR GRADING W/ INDIVIDUAL LOTS REMAIN. STORM WATER CONCERNS ARE MINIMAL, HOWEVER SITE IS NOT BUILT OUT. | |
09/10/2009 | STORMWATER FOLLOW-UP INSP | Continued | SITE WORK IS SUBSTANTIALLY COMPLETED, SOME STABILIZATION WORK AND REPAIR LEFT TO BE DONE. NO SIGNIFICANT STORM WATER CONCERNS ON SITE. RESIDENTIAL LOTS NOT STABILIZED, CONTRACTOR BLDG ON 4 LOTS. | |
09/03/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
08/26/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
04/21/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
02/02/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
01/08/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
09/18/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
09/11/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | ALL OUTSTANDING ITEMS HAVE BEEN COMPLETED. NO STORMWATER CONCERNS. |
|
09/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SOME OF THE CORRECTIONS HAVE BEEN COMPLETED. | |
09/04/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE FOR COMPLIANCE WITHIN 5 DAYS, NONCOMPLIANCE WILL RESULT IN NOTICE OF VIOLATION. 1. PROVIDE SEDIMENT AND EROSION CONTROLS ON PERIMETER SLOPES. 2. PROVIDE SEDIMENT AND EROSION CONTROLS AT RETENTION/DETENTION BASIN OUTLETS. 3. PROVIDE SEDIMENT AND EROSION CONTROLS AT ALLEY OUTLET TO PUBLIC STREET. 4. SWEEP PUBLIC STREET (NORTH OF PROJECT) OF ALL SEDIMENT AND SOIL. 5. BACKFILL PERIMETER WALL FOOTINGS AND REMOVE EXCESS SOIL. |
|
06/12/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE MAINTENANCE ON STABILIZED CONSTRUCTION ENTRANCE. (30' X 50' X6") 2. REMOVE LOOSE SOIL FROM ALLEY WAY ON NORTH AND EAST PERIMETERS. 3. PROVIDE STRAW WATTLE AT NORTHEAST CORNER OF SITE AND AT CENTER OF NORTH PERIMETER. 4. PROVIDE A UNIFORM COMPACTED SLOPES ON NORTH AND EAST PERIMETER WHERE THE 3:1 SLOPE CAN BE CONSTRUCTED AT THIS TIME. |
|
05/29/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 7 DAYS FOR COMPLIANCE OR NOV AND STOP WORK ORDER WILL BE ISSUED. 1. PROVIDE COMPLETE PERIMETER CONTROLS (V-DITCH). 2. EXCAVATE SEDIMENTATION BASINS. 3. PROVIDE STRAW BALE WEIR DISCHARGE POINTS ON SEDIMENTATION BASINS. 4. TRACK AND COMPACT SLOPES ON OUTSIDE PERIMETER. |
|
05/19/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE A MAJOR CONSTRUCTION ACTIVITY SCHEDULE (SWPPP 3.3, PAGE 6). 2. CONSTRUCT SEDIMENT BASINS 1,3 AND 5, VERIFY SIZE WITH PAUL IEZZI/RICK ENGINEERING (SWPPP 4.2 PAGE 17). 3. RECONSTRUCT STABILIZED CONSTRUCTION ENTRANCE (SWPPP 4.3.2 PAGE 18). 4. PROVIDE SWPPP CONTROLS FOR SEWER EXCAVATION NORTH OF PROPERTY. 5. REMOVE ASPHALT FROM SEDIMENT BASIN #1. 6. PROVIDE CONCRETE WASHOUT AND DESIGNATED EQUIPMENT PARKING AREA. 7. SWEEP DIRT AND ROCK FROM HARRISON ROAD. ADDRESS ITEMS 3, 4, AND 7 WITHIN 24 HOURS, AND THE REMAINING ITEMS WITHIN 7 DAYS. CALL 740-6970 FOR RE-INSPECTION |