Permit: T07BU00352


Addresses:

1150 N HARRISON RD


Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Permit Number - T07BU00352

Inspection Description - STORMWATER INSTALL OF CONTROLS

Inspection Status - Approved

Date Description Inspector Results Comments
04/25/2008 STORMWATER INSTALL OF CONTROLS Approved GRADER DITCH HAS BEEN COMPLETED AT NORTH AND EAST PERIMETERS. BOB MALLORY WILL INSPECT AND DETERMINE WHAT CONTROLS WILL BE INSTALLED FOR LOOSE GROUND ON SLOPES WHERE GRUBBING OCCURRED BEYOND THE GRADER DITCH.
04/24/2008 STORMWATER INSTALL OF CONTROLS Correction Required GRADER DITCH AT PERIMETER IS REVERSED, CUT MUST BE ON OUTSIDE PERIMETER WITH WHEEL ROLLED BERM ON INSIDE.
BO WILL REVERSE DITCH/BERM.
04/23/2008 STORMWATER INSTALL OF CONTROLS Correction Required 1. THE SECOND DAY OF GRUBBING IS IN PROGRESS, THE PERIMETER CONTROLS HAVE NOT BEEN INSTALLED. DAVE OLLANICK WILL CALL O'LEARY. THE CONTROLS MUST BE INSTALLED BY TOMORROW 4/24/08 OR STOP WORK WILL BE ISSUED.
2. RE-INSTALL STRING LINE AT SOUTH GRADING LIMIT.
3. POST THE AZPDES
04/21/2008 STORMWATER INSTALL OF CONTROLS Partial Approval STABILIZED CONSTRUCTION ENTRANCE IS IN PLACE. GRUBBING AND V-DITCH TO BE STARTED TOMORROW, CLEAR DRY WEATHER IS PREDICTED AND ALL CONTROLS WILL BE IMPLEMENTED THIS WEEK.