Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU00292
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/18/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
10/10/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH-OUT ON SITE PER YOUR PLAN 2) CONTINUE TO MAINTAIN PERIMETER SEDIMENT CONTROLS ON SITE UNTIL SITE IS STABILIZED. 3) DOCUMENT ALL STORM WATER SELF INSPECTIONS PER PLAN. 4) CONTINUE TO SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAYS AS NEEDED. |
|
08/16/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | ADD SEDIMENT CONTROLS TO NORTHEAST CORNER OF SITE WHERE TRENCHING WORK IS BEING DONE. | |
07/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) NEED A CONCRETE/MATERIALS WASH OUT PER YOUR PLAN ON SITE. PROVIDE AN OBVIOUS DEPRESSED OR BIRMED AREA TO KEEP MATERIAL FROM MIGRATING. 2) PROVIDE SELF INSPECTIONS PER PLAN. 3) RE-ESTABLISH ROCK ENTRANCE. |
|
07/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | * PER CONVERSATION WITH THE SITE SUPERINTENDENT, CONCRETE WASH-OUT IS LOCATED AT LOADING DOCK AT WEST SIDE OF SITE. * INSTALL A SIGN AT LOCATION OF WASH-OUT. * MAY NEED TO ADD SUPPLEMENTAL CONTROLS TO EXISTING SILT SOCK LOCATED ALONG NORTH PERIMETER BASED ON HOW THEY PERFORM DURING MONSOON SEASON. * PER CONVERSATION WITH SITE SUPERINTENDENT (PHILL GULLEY, CHESNUT CONSTR., 275-0418) ROUTINE STORM WATER MAINT. SELF INSPECTION HAVE BEEN COMPLETED AND DOCUMENTED. |