Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T07BU00292
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/11/2007 | STORMWATER INSTALL OF CONTROLS | Approved | ||
07/03/2007 | STORMWATER INSTALL OF CONTROLS | Correction Required | NO RESPONSE FROM PREVIOUS INSPECTION. NON-COMPLIANCE BY 7/9/07 WILL RESILT IN A STOP WORK ORDER. 1) INSTALL A DESIGNATED CONCRETE WASH OUT ON SITE. 2) SWEEP UP TRACKED MATERIAL OFF OF FORBES (PUBLIC ROADWAY). 3) PROVIDE DOCUMENTATION OF STORM WATER SELF INSPECTIONS. |
|
06/20/2007 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) ADD WADDLE TO INSTALLED CONTROLS ALONG THE NORTH PERIMETER. 2) ADD WADDLE TO SOUTH PERIMETER AT POINT AREED UPON IN PREVIOUS INSPECTION - SW BOUNDRY OF SITE. 3) INSTALL A DESIGNATED CONCRETE WASH OUT ON SITE PER YOUR SWPPP. 4) PROVIDE DOCUNMENTATION OF YOUR STORM WATER SELF INSPECTIONS. COMPLY BY 7/2/07 - NON-COMPIANCE WILL RESUL IN A STOP WORK ORDER. |