Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T07BU00292
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/11/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
06/12/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | CORRECTION REQUIRED: 1) POST A SIGN AT ENTRANCE WITH AZPDES AUTHORIZATION NUMBER OR A SIGNED COPY OF YOUR NOI. 2) STORM WATER SELF INSPECTIONS ARE REQUIRED EVERY 14 DAYS AND AFTER A 0.5" RAIN EVENT. 3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER STORM WATER PLAN SPECS (50X30', ROCK OVER FILTER FABRIC, 1-3" ROCK, 6" DEEP). 4) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT PER STORM WATER PLAN SPECS. 5) HAVE A DESIGNATED AREA FOR HAZARDOUS MATERIALS STORAGE. 6) INSTALL BMP'S PER YOUR STORM WATER PLAN. COMPLY BY WED 6/20/07, NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER UNTIL CONTROLS ARE INSTALLED. OPERATOR IN CHARGE - MICHAEL WATTIS SUPER - PHIL GULLEY (CHESNUT) - 275-0418 |