Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2011 | STORMWATER FOLLOW-UP INSP | Continued | LANDSCAPER WORKING ON CLEANING OUT WASH ON WEST SIDE OF LOTS. | |
| 07/19/2010 | STORMWATER FOLLOW-UP INSP | Continued | SITE HAS NOT BEEN WORKED FOR SOME TIME. CURRENT STORMWATER CONTROLS ARE INSUFFICIENT. SILT FROM SITE IS TRAVELING OVER OLD EXISTING WATTLE. | |
| 09/02/2008 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | Buck called to re-schedule meeting. | |
| 08/26/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Issude correction notice. Contractor needs to; 1- Install all SWPPP controls. 2- Post NOI. (2008) 3- Stabilize all areas disturbed by construction. 4- Call in for all needed inspections. Spoke to Buck on site in regards to all issues. Contractor has 2 days to address, if items not addressed will issue NOV. |
|
| 08/26/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Met on site with Buck site super in regards to NOV. Went over all items that need to be addressed. |