Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 04/02/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | NO CHANGE IN SITE ROADWAY BEING CUT IN STILL |
|
| 03/28/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | RETURNED TELEPHONE CALL FROM MONDAY DROVE BY SITE-ACCESS ROAD WORK IS CONTINUING-AS IS GRUBBING QWEST HAS A LARGE AMOUNT OF DEBRIS IN ROW AND BEHIND SIDEWALK FROM CABLE INSTALLATION |
|
| 03/22/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | GRUBBING WORK STARTING ROAD WORK HAS STARTED FOR ACCESS |
|
| 03/14/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | MET WITH WADE (APN BUILDERS) BEFORE NPPO PRECON FUTURE ROADWAY HAS BEEN GRUBBED. GRADING LIMITS HAVE BEEN ROPED OFF. TALKED TO PERMITS AND CODES INSPECTOR SHE IS NOT AWARE OF A PERMIT FOR THIS ROADWAY |
|
| 03/09/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | sent email to Craig Gross, Jim Vogelsberg, Bev Hester. Cc'd Paul Machado, Laith Alshami and James Femling Requesting direction on how to proceed as grading permit has been issued and no roadway is exisiting. |
|
| 03/07/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | PRECON ON SITE ROADWAY IS STAKED FOR CLEARING/GRUBBING NO WORK HAS BEGUN NO ACCESS TO SITE MET WITH WADE APN BUILDERS 360-2798 AND DONNY K&B ASPHALT 620-0555 |