Permit: T07BU00267

Parcel: 141185710

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
10/30/2007 ENGINEERING PRE-CONSTRUCTION Approved
04/02/2007 ENGINEERING PRE-CONSTRUCTION Correction Required NO CHANGE IN SITE
ROADWAY BEING CUT IN STILL
03/28/2007 ENGINEERING PRE-CONSTRUCTION Correction Required RETURNED TELEPHONE CALL FROM MONDAY

DROVE BY SITE-ACCESS ROAD WORK IS CONTINUING-AS IS GRUBBING
QWEST HAS A LARGE AMOUNT OF DEBRIS IN ROW AND BEHIND SIDEWALK FROM CABLE INSTALLATION
03/22/2007 ENGINEERING PRE-CONSTRUCTION Correction Required GRUBBING WORK STARTING
ROAD WORK HAS STARTED FOR ACCESS
03/14/2007 ENGINEERING PRE-CONSTRUCTION Correction Required MET WITH WADE (APN BUILDERS) BEFORE NPPO PRECON
FUTURE ROADWAY HAS BEEN GRUBBED. GRADING LIMITS HAVE BEEN ROPED OFF.
TALKED TO PERMITS AND CODES INSPECTOR SHE IS NOT AWARE OF A PERMIT FOR THIS ROADWAY
03/09/2007 ENGINEERING PRE-CONSTRUCTION Correction Required sent email to Craig Gross, Jim Vogelsberg, Bev Hester. Cc'd Paul Machado, Laith Alshami and James Femling

Requesting direction on how to proceed as grading permit has been issued and no roadway is exisiting.
03/07/2007 ENGINEERING PRE-CONSTRUCTION Approved PRECON ON SITE
ROADWAY IS STAKED FOR CLEARING/GRUBBING NO WORK HAS BEGUN
NO ACCESS TO SITE
MET WITH WADE APN BUILDERS 360-2798 AND DONNY K&B ASPHALT 620-0555