Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2008 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 02/21/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PAVING OF SITE BEING DONE TODAY. WILL RE-INSPECT AND ASSESS STORM WATER CONCERNS AT FOLLOW-UP INSPECTION. | |
| 02/05/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | RAINING TODAY, LIGHT ACTIVITY. SEDIMENT CONTROLS IN PLACE AND ARE WORKING. SOME MAINT. NEEDED. |
|
| 01/16/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) DISPOSE OF WASTE CONCRETE, WASH-OUT FULL. 2) RE-ESTABLISH ROCK ENTRANCE 3) SWEEP UP DIRT OFF OF CASTRO 4) CONTINUE TO PERFORM AND DOCUMENT STORM WATER SELF INSPECTION. |
|
| 11/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 11/01/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) CLEAN OUT CONCRETE WASH OUT, IT'S FULL 2) ENSURE WASTE MATERIALS USED ON SITE ARE CONTAINED AND DISPOSED OF PROPERLY 3) RE-ESTABLISH CONSTRUCTION ENTRANCE 4) CONTINUE TO SWEEP UP TRACKING OFF OF PUBLIC ROADWAY ON A ROUTINE BASIS 5) CONTINUE TO DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP. 6) ANY SIGNIFICANT CHANGES TO THE APPROVED GRADINGF PLAN MUST BE SUBMITTED BY THE ENGINEER OF RECORD AND APPROVED BY THE CITY OF TUCSON. |
|
| 09/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME. | |
| 09/19/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO NEW STORM WATER CONCERNS AT THIS TIME. ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER PLAN. DISPOSE OF ALL CONCRETE AND CONSTRUCTION WASTE PROPERLY. | |
| 09/06/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | ALL ITEMS LISTED ON PREVIOUS INSPECTION 8/27/07 HAVE BEEN ADDRESSED. ENSURE CONCRETE WASH OUT IS SIGNED. CONTINUE TO SWEEP UP TRACKING. |