Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2007 | STORMWATER INSTALL OF CONTROLS | Approved | ||
| 08/27/2007 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) RE-INSTALL SEDIMENT CONTROLS ALONG NORTH PERIMETER PEE YOUR PLAN - CONTROLS ARE BURRIED. 2) CLEAN UP CONCRETE WASTE AND INSTALL A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE PER YOUR PLAN. 3) PROVIDE STORM WATER SELF INSPECTIONS AS REQUIRED BY YOUR PLAN. 4) PLACE SEDIMENT CONTROLS AROUND STOCKPILED MATERIAL LOCATED ON SE CORNER OF SITE OR MOVE IT AWAY FROM PERIMETER. COMPLY BY 7 WORKING DAYS - NON-COMPLIANCE WILL RESULT IN A NOV. |
|
| 07/30/2007 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) INSTALL STABILIZED CONSTRUCTION ENTRANCE PER PLAN. 2) POST A SIGNED COPY OF YOUR NOI ON SITE. 3) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT AS SOON AS NEEDED. 4) SWEEP UP TACKING ON A ROUTINE BASIS. 5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER PLAN. |