Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T07BU00258
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2021 | GRADING - FINAL | Approved | ||
08/16/2019 | GRADING - FINAL | Continued | THE SITE HAS BEEN CONSTRFUCTED BUT NOT PER THE APPROVED PLANS TOTALLY IN THE FOLLWOING MANNER: 1) THE PLANS CALL OUT ON NOTE #4 TO CONSTRUCT A 1,100 CU FT RETENTION BASIN AND PLACE ROCK RIP RAP ON FILTER FABRIC. THIS HAS NOT BE CONSTRUCTED AT THIS TIME. COMPLETE THIS WORK, ALONG WITH GENERAL SITE CLEANUP PRIOR TO SCHEDULING A RE-INSPECTION FOR THIS SITE. |
|
06/24/2019 | GRADING - FINAL | Continued | tHIS SITE NEEDS TO BE INSPECTED FOR THE FINAL AND MAY NOT BE CLOSED OUT TILL ALL INSPECTIONS HAVE BEEN COMPLETED AND APPROVED. | |
11/18/2009 | GRADING - FINAL | Continued | DISCUSSED SITE WITH DAVE ROBERTS. NO CONSTURCTION ON SITE. ALL HOMES OCCUPIED, ASBUILTS REQUIRED FOR CHANGES APPROVED BY MATT FLICK. | |
11/12/2009 | GRADING - FINAL | Correction Required | CONTRACTOR NEEDS TO CLOSE OUT PERMIT. NO ACTIVITY AT THIS TIME. | |
02/09/2009 | GRADING - FINAL | Correction Required | Contractor needs to close out permit and complete punch list. | |
08/19/2008 | GRADING - FINAL | Correction Required | Contractor needs to complete punch list dated 8/15/08. Basin still not operating, holding water longer then 24 hours. | |
08/15/2008 | GRADING - FINAL | Denied | Contractor needs to: 1- Stabilize all areas disturbed by construction. 2- Stabilize alley south side of project. 3- Address Retention Basin holding water longer then 24 hours. 4- Build Retention Basin per approved plans. (Inlet, discharge and grade to smooth uniform finsh) 5- Remove all construction debris from site. 6- Backfill along bottom of block wall. 7- Repair asphalt between 1500 and 1504. 8- Address block wall extending into Retention Basin. 9- Have engineer show block wall and changes to flow on as-built drawing. (for approval at 201 N Stone. Exceed grading limits) 10- Install header at ends of asphalt. (flow undermining asphalt) 11- Have engineer address all slopes steeper then 3 to 1. (stabilization) 12- Remove all storm water controls once all areas stabilized. |
|
08/05/2008 | GRADING - FINAL | Not ready for Inspection | Contractor removing top 6" of material from basin. Replacing with sand. Contractor hoping this will stop basin from holding water for more then 24 hours. | |
07/21/2008 | GRADING - FINAL | Correction Required | Issued NOV. Contractor has 20 days to correct problems with basin (no swppp controls, holding water longer then 24 hours). If items are not addressed will issue stop work order for site. |