Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU00258
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2021 | STORMWATER FOLLOW-UP INSP | Approved | ||
06/03/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address wash out and SWPPP controls on site. Pictures taken of site. Spoke to Jim Brooks in regards to. | |
04/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Need to clean washout around site. | |
03/19/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address wash out around site. Provide wash out area for sub's. | |
12/17/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor starting 3rd. house. Contractor needs to provide washout location for sub-contractors. Sent e-mail to Jim B. in regards to cuts and side slopes. | |
10/18/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity on site at this time. Contractor working on ruff grading of lots. Need to install controls per approved plans. | |
09/27/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor started grading on site. Need to install construction entrance. | |
08/14/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor need to install controls on northwest corner in channel. |