Permit: T07BU00180

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
02/06/2009 STORMWATER FOLLOW-UP INSP Approved
08/21/2008 STORMWATER FOLLOW-UP INSP Correction Required Contractor still needs to remove wattle around site.
06/02/2008 STORMWATER FOLLOW-UP INSP Correction Required Met with MIke G. on site. Explained to Mike all areas disturbed by construction need to be stabilized and grading permit will not be released until all areas are.
02/21/2008 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor needs to:
1- Sweep Cale Santa Cruz. all track out to light.
2- Remove mud from gutter line.
3- Install construction entrance at all access pionts.
4- Clean wash out from masons.
5- Uncover and install controls around all catch basins.
6- Clean wash out from painters.
7- Provide wash out area for all sub contractors.
8- Clean wash out from stucco contractors.
9- Install controls in wash crossing at Calle Santa Cruz.
Unable to contact Clint site super in regards to. Went over all info with Mike G. super with Barclay.
01/28/2008 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Repair controls on northwest corner.
2- Provide phased plan (approved) plan for C of O release.
3- Repair all controls along Airport Wash.
4- Clean slit out of Airport Wash.
Spoke to Mike in regards to.
12/10/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor needs to:
1- Clean track out from site.
2- Clean out front of catch basin.
Contractor has 5 days to complete. If items are not completed I will issue a stop work order or a notice of violation. Spoke to Clint site super in regards to.
10/25/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to make repairs to SWPPP controls. Spoke to Clint in regards to.
07/19/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Clean up sewer leak.
2- Repair construction entrance.
3- Repair SWPPP controls around drain pipe, northeast corner.
4- Remove spoil material from airport wash bank. Run controls to edge of trench.
5- Repair wattle northeast northeast corner.
6- Clean up slit from holding pond blow out.
Spoke to Clint, site super in regards to.
07/17/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor installing stormwater pipe per SD at sta 6+00.
07/10/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor installed two of the 5 sediment basins.
07/03/2007 STORMWATER FOLLOW-UP INSP Correction Required Spoke to Clint, explained to Clint if sediment basins are not installed the city will issue a stop work order. Clint said he would get them installed and asked me to stop by 7/4/07.
07/02/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Close entrances not used or have construction entrance. Keep all entrances being use by traffic in working order.
2- Continue to sweep streets.
3- Install sediment traps per approved drawings.
Spoke to Clint in regards to. Contractor installing wet utilitys.
06/14/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor install controls in all curb cuts and pipe inlet. Contractor needs to sweep up track out.
06/12/2007 STORMWATER FOLLOW-UP INSP Not Applicable Met with Jim F. and Clint on site to discussed sediment ponds and SWPPP controls. Clint asked for me to stop by 6-13-07.
06/08/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Install temporary sediment ponds. Per approverd SWPPP.
2- Install swale for drainage. Per approved SWPPP.
3- Keep all construction entrances in working order. Per approved SWPPP.
4- Install inlet barrier (BMP-110). Per note #4 on approved SWPPP.
5- Post NOI.
6- Repair holes in wattle and keep wattle uncovered.
7- Install additional controls a long I-19.
8- If contractor keeps wetting Calle Santa Cruz, contractor will need to install controls in in all stormwater inlets.
Note: Keep Calle Santa Cruz clean.
Spoke to Clint site super in regards to issues.
06/07/2007 STORMWATER FOLLOW-UP INSP Partial Approval Street clean then 2 days ago. Contractor stop wetting down haul road.
06/05/2007 STORMWATER FOLLOW-UP INSP Correction Required Spoke to Clint site super in regards to track out from site. Track out pads are not working. Contractor needs to address track out, if not stop work order will be issued. Went over several ideas that may help stop track out, i.e. tire bath, larger rock pads, sweep more.
05/16/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to sweep Santa Cruz. Spoke to Clint (603-9889) Site super.
05/14/2007 STORMWATER FOLLOW-UP INSP Correction Required Received complaint call from COT Trans. about track out. Went by site and contacted Clint site super and explained he needed to clean street. Clint said he would get it cleaned up.