Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2008 | GRADING - FINAL | Approved | Received a copy of the revised drawing showing changes made to the ret/det basins on site, and a copy of the certification statement from the engineer of record. All pertinent documents have been filed with the site records. A copy of those documents were also sent to the review engineer with the City of Tucson, Matt Flick. I have no concerns or problems with the site, and the grading permit has been approved by engineering. Mike Russo, Engineering Inspector, Dev. Services. |
|
| 01/24/2008 | GRADING - FINAL | Correction Required | NEED RET/DET BASIN CERT FROM ENGINEER OF RECORD AND PROOF OF APPROVED, REVISED GRADING PLAN (MATT FLICK) | |
| 01/03/2008 | GRADING - FINAL | Not ready for Inspection | 1) PROVIDE AN APPROVED REVISED PLAN SHOWING CHANGES MADE TO THE ORIGINAL GRADING PLAN. 2) PROVIDE A RET/DET BASIN CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL BASINS AND DRAINAGEWAYS ON SITE WERE COMPLETED PER THE APPROVED GRADING PLANS. 3) COMPLETE ALL SITE WORK TO INCLUDE LANDSCAPING, RIP RAP AN HYDROSEED. |