Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T07BU00008
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2009 | GRADING - INTERMEDIATE | Approved | ||
02/12/2009 | GRADING - INTERMEDIATE | Partial Approval | LAST PHASE OF WORK BEING STARTED (NW PARKING LOT) | |
12/16/2008 | GRADING - INTERMEDIATE | Partial Approval | TJ IN A MEETING WALKED SITE H/C PARKING FOR THIS PHASE IS IN FRONT OF USED CAR SALES AREA |
|
10/29/2008 | GRADING - INTERMEDIATE | Partial Approval | WORK ON W SIDE ALONG/IN ROW ON KOLB | |
10/06/2008 | GRADING - INTERMEDIATE | Partial Approval | WORK CONTINUING MID DEC TARGET FOR OCCUPANCY NO STORMWATER CONCERNS AT THIS TIME |
|
06/23/2008 | GRADING - INTERMEDIATE | Partial Approval | CHECKED SITE-TEMP C OF O ISSUED 6/20 BY BUILDING INSP NO MAJOR CONCERNS AT THIS TIME DISCUSSED THE MISSING H/C PARKING SIGNS AND STORMWATER CONTROL PLACEMENT FOR DEMO PHASE |
|
06/20/2008 | GRADING - INTERMEDIATE | Partial Approval | -PAVERS NOT COMPLETE AT N SIDE OF SHOWROOM/OFFICES -DRIVEWAY NOT YET CURED -STRIPING NOT COMPLETE -FENCING NOT IN PLACE -TRACK OUT ONTO 22ND ST ??-COBBLESTONE PAVERS ADA COMPLIANT ??-70% CONTRAST ON TRUNCATED DOMES |
|
06/20/2008 | GRADING - INTERMEDIATE | Partial Approval | ONSITE MEET FOR C OF O PRE INSPECTION | |
06/05/2008 | GRADING - INTERMEDIATE | Partial Approval | SITE VISIT-OFFICE MEETING WITH LEE RAY AND JIM F NO REVISED PLANS ON SITE FOR SITE OR GRADING THE ONLY REVISED DRAWINGS ARE FOR LANDSCAPE ADVISED CHRIS TO CALL BEFORE POURING RAMPS AND THAT TRUNCATED DOMES ARE TO BE INSTALLED PER PLAN |
|
06/04/2008 | GRADING - INTERMEDIATE | Partial Approval | WALKED SITE WITH TJ AND CHRIS WITH JOHNSON CARLIER CONCERNS REGARDING THE REMOVAL OF TRUNCATED DOMES WERE RAISED THERE SHOULD BE A REVISED PLAN SHOWING ANY CHANGES-NEEDS TO BE REVIEWED BY ENG INSPECTOR |
|
04/28/2008 | GRADING - INTERMEDIATE | Partial Approval | MET WITH TJ AND DJ ON SITE TO DISCUSS PHASING PLAN ADA NEEDS SHOULD BE ADDRESSED AND ALL PUBLIC AND CONSTRUCTION TRAFFIC SHOULD BE COMPLETELY SEPARATED SCE SHOULD BE MOVED TO KOLB ROAD |
|
04/16/2008 | GRADING - INTERMEDIATE | Partial Approval | STORMDRAIN STILL BEING INSTALLED | |
02/13/2008 | GRADING - INTERMEDIATE | Partial Approval | LEFT EXTRA BUSINESS CARDS WITH TJ WLB WILL BE DOING ALL INSPECTIONS FOR STORMDRAIN FACILITIES AND WILL CERTIFY AT THE END OF THE PROJECT |
|
02/12/2008 | GRADING - INTERMEDIATE | Partial Approval | MET WITH TJ AND STEVE CUFF ONSITE -INSPECTIONS OF ALL STORMDRAIN FACILITIES TO BE DONE AND CERTIFIED BY EOR |
|
11/08/2007 | GRADING - INTERMEDIATE | Partial Approval | RECEIVED FINISH PAD ELEVATION CERT |