Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU00008
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
01/07/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | VERTICAL WORK CONTINUING NE CORNER NOT YET STARTED NO CONCERNS AT THIS TIME |
|
12/16/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONTROLS IN PLACE AT CATCH BASIN ON KOLB NO SEDIMENT MIGRATING OFF SITE TRACK OUT CONTAINED ON SITE |
|
11/28/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO WORK ON SITE TODAY | |
11/20/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS WORK HAS STARTED IN ROW AT STORM DRAIN CATCH BASINS |
|
10/22/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO MAJOR STORMWATER CONCERNS WATTLE TO BE REPLACED AROUND CONCRETE BATCH PLANT AREA |
|
08/20/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS SITE WORK CONTINUING |
|
08/15/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS MET ONSITE WITH JERRY C (GEN MGR) AT CAR STORAGE SITE TO DISCUSS EROSION |
|
06/04/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | INTERCEPTOR INSTALLED AT INLET TO COT STORMDRAIN FROM SITE STORMDRAIN NO CONCERNS AT THIS TIME PHASE 2 CONSTRUCTION TO START IN NEXT FEW WEEKS |
|
04/28/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | LABORERS SWEEPING 22ND AT SCE | |
03/18/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ 602 399 3618 STORMDRAIN WORK TO START AGAIN 3/19 TEMP C OF O BY END OF JUNE-PHASED PLAN IN EXISTENCE ALREADY TJ WILL GET A COPY FOR ME TO SEE TRACK OUT ON 22ND WAS SWEPT LAST NIGHT AND WILL BE SWEPT AGAIN TODAY-ADDL ROCK TO BE DELIVERED TODAY |
|
03/14/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE VISIT TJ NOT ON SITE TODAY TALKED TO OTHER SUPERINTENDANT ABOUT PHASE PLAN-TEMP C OF O IS ANTICIPATED END OF JUNE FOR NEW SHOP AREA TRACK OUT ONTO 22ND STREET |
|
02/12/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | TRACK OUT ONTO 22ND STREET TO BE ADDRESSED PER TJ-DAILY SWEEPING IS HAPPENING | |
12/18/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME WALKED SITE SUPER UNAVAILABLE-CONSTRUCTION MEETING GOING ON |