Inspection History Details
Inspection Status: Approved
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/07/2006 | INITIAL CODE VIOLATION | Approved | -SOUTHWEST GAS PINNED METER -OWNER SECURED AND UNDER CONSTRUCTION RECD CALL FROM COMM THAT TFD ON SITE W/LUMBER FIRE. ARRIVED TO SITE AND UNITS STILL WORKING FIRE. A STACK OF T1J1 TRUSSES WERE BURNING. FIRE FIGHTERS HAD TO SEPARATE TRUSSES AND PUT THEM IN AN EMPTY POOL. FIRE BURNED EXTERIOR SIDING ON NORTH ENTRY WHERE TRUSSES WERE STACKED. FIRE PENETRATED INTERIOR IN SOME AREAS AND DRYWALL WAS REMOVED TO CHECK WALL AND CEILING FOR FIRE. NO OTHER DAMAGE TO BUILDING. THIS STRUCTURE IS BEING REMODELED WHICH HAS SOME DEMO AND CHANGING OF ROOMS. SO WEST GAS PINNED METER DUE TO UNABLE TO FIND GAS APPLIANCES. WILL MAKE CONTACT W/BUILDER. OWNER CAME TO SITE AND GOT INFO. HE SIGNED DAMAGE REPORT AND NOTICE OF VIOLATION. OWNER CALLED JOB FOREMAN AND ONCE ARSON INVESTIGATION IS DONE, OWNER AND FOREMAN WERE GOING TO SECURE STRUCTURE AND GATES. WILL CHECK IN 15 DAYS. NOTE: OWNER ADVISED TO MEET W/INSPECTOR DOING INSPECTION OF CURRENT CONSTRUCTION. |