Inspection History Details
Inspection Status: Approved
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/25/2006 | INITIAL CODE VIOLATION | Approved | FIRE IN KITCHEN, ROOF, PARTITION WALL BETWEEN APTS. GRYP BOARD. ALL ELECT EVALUATED/REPAIRED/UPGRADED BY LICENSED ELECTRICAL CONTRATOR. PLUMBING EVAL BY CONTRACTOR REPAIRED AS NEED. ORDERED BATHCREST TO BOARD UP OF WINDOW ON EAST SIDE OF HOME. PERMITS REQUIRED. FW/UP 60 DAYS. | |
| 05/25/2006 | INITIAL CODE VIOLATION | Approved | DAMAGE REPORT 2002 S MONTEZUMA CAUSE OF DAMAGE-FIRE-06-29 LOCATION OF DAMAGE-KITCHEN BUILDING- ROOF PARTITION-COMMON WALL BETWEEN APTS GYP-BOARD. ELECTRICAL-ALL ELECT. EVALUATED/REPAIRED/UPGRADED BY LICENSED ELECTRICAL CONTRACTOR. CAUSE OF FIRE. PLUMBING- EVAL. BY CONTRACTOR. REPAIRED AS NEEDED MECHANICAL-N/A PERMITS REQUIRED BATHCREST TO SECURE 2002. FOLOW-UP 60 DAYS. |