Inspection History Details
Inspection Status: Approved
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/15/2007 | INITIAL CODE VIOLATION | Approved | SEE SIRE TO VIEW NOV/NOTES. | |
| 05/17/2006 | INITIAL CODE VIOLATION | Approved | DAMAGE REPORT ELECTRICAL - MAIN STRUCTURE - CHURCH NO DAMAGE. MOBILE HOME 2 - DAMAGED AND POWER TURNED OFF AT SWITCH GEAR. MOBILE HOME 1 HAS WIRE EXPOSED WHERE SIDING WAS REMOVED TO CHECK FOR FIRE PENETRATION. PLUMBING - OK ON MAIN STRUCTURE - CHURCH. MOBILE HOME 2 HAS HEAVY SMOKE DAMAGE TO FIXTURES BUT NO DAMAGE TO PIPING. MOBILE HOME 1 HAS NO DAMAGE. MECHANICAL - MAIN STRUCTURE - CHURCH NO DAMAGE. MOBILE HOME 2 COOLER HAS BEEN BURNED, CEILING HAVE BEEN BURNED ON HALF OF MOBILE HOME, DAMAGE TO DUCT WORK. BUILDING - MAIN STRUCTURE - CHURCH NO DAMAGE. MOBILE HOME 2 HAS STRUCTURAL DAMAGE TO HALF OF HOME TO WALLS AND ROOF. MOBILE HOME 1 HAS SIDING ON EAST SIDE REMOVED TO CHECK FOR FIRE PENETRATION. CHURCH REQUIRES NO PERMITS, MOBILE HOME 2 TOTAL LOST WILL NEED PERMIT TO REMOVE OFF SITE. MOBILE HOME 1 WILL REQUIRE A PERMIT ON CORRECTION OF SIDING AND ELECTRICAL CHECKED ON EAST SIDE. |