Inspection History Details
Inspection Status: Approved
Inspection History: FOLLOW UP CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2006 | FOLLOW UP CODE VIOLATION | Approved | NO WORK DONE, VACANT & SECURED. WILL CHECK IN 30 DAYS. | |
| 09/14/2006 | FOLLOW UP CODE VIOLATION | Approved | DRYWALL HAS BEEN REPAIRED AND HAVE SKIM COATED ALL BURNED AREAS. ALL WALLS HAVE BEEN HAULED AND TROWELED. READY FOR PAINT. LACKING CHANGING OF OUTLETS AND SWITCHES THAT SMOKED DAMAGE HAS NEW DOOR AT ENTRY WILL CHECK IN 15 DAYS. | |
| 08/09/2006 | FOLLOW UP CODE VIOLATION | Approved | WENT TO SITE AND REPAIRS HAVE BEGUN. TALK TO MAINTENANCE AND REPAIRS SHOULD BE DONE IN ABOUT 2-WEEKS. WILL NEED TO CHECK UNIT BEFORE POWER TURNED BACK ON. WILL CHECK IN 30 DAYS. |
|
| 06/13/2006 | FOLLOW UP CODE VIOLATION | Approved | WENT TO SITE AND UNIT IS SECURED AND STILL VACANT. MET WITH MANAGEMENT AND WILL START DOING ACTUAL REPAIRS NEEDED. ASKED IF DRY WALL GOING TO BE REPLACED AND SAID YES. ADVISED THAT PERMIT WILL BE REQUIRED TO REPLACE DRY WALL. WILL CHECK IN 21 DAYS. |