Inspection History Details
Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2006 | FOLLOW UP CODE VIOLATION | Compliance | A PERMIT HAS BEEN ISSUED TO6CM03295 ON 6-2-06 BUT NO INSPECTION. DUE TO BEING A COMMERICAE BUILDING AND INSPECTED BY DEVELOPENT SERVICE, THIS CASE WILL BE CLOSED. VIOLATION ABATED, CLOSE CASE |
|
| 06/01/2006 | FOLLOW UP CODE VIOLATION | Approved | DID TALK TO MANAGER LEE ANN AND NO REPAIRS HAVE BEEN DONE. CONTRACTOR HAS NOT APPLIED FOR PERMIT DUE NOT IN PERMIT PLUS. HAVE TALK TO JEFF THE DIRECTOR OF OPERATION AND HE'S WAITING FOR PERMITS TO BE APPROVED DUE TO THE ENGINEERS HAVE ALREADY MET WITH HIM AND HAVE DRAWINGS DONE. WILL CHECK IN 14 DAYS. |