Inspection History Details
Inspection Status: Approved
Inspection History: FOLLOW UP CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2006 | FOLLOW UP CODE VIOLATION | Approved | WENT TO SITE AND BUILDING IS SECURED. PERMIT HAS BEEN ISSUED T06CM03297 ON 7-5-06. NO INSPECTION DONE AND WORK HAS NOT STARTED. TALKED TO OWNER AMY AND CONTRACTOR IS BEHIND ON OTHER WORK. WILL CHECK IN 30 DAYS. | |
| 06/30/2006 | FOLLOW UP CODE VIOLATION | Approved | PERMIT HAS BEEN APPROVED BY NOT PAID FOR T06CM03297 ON 6-28-06 . DID TALK TO OFFICE AND THEY WERE GOING TO CALL THE CONTRACTOR. ALL IS STILL SECURED DUE TO PAST THE SITE ON WED. WILL CHECK IN 30 DAYS |
|
| 06/01/2006 | FOLLOW UP CODE VIOLATION | Approved | PROPERTY IS SECURED AND OWNER IS TRYING TO GET PERMITS. HAVE BEEN IN CONTACT WITH CONTRACTOR BY PHONE FOR INFO. WILL CHECK IN 24 DAYS. | |
| 04/13/2006 | FOLLOW UP CODE VIOLATION | Approved | MET WITH OWNER AT SITE AND SHOP HAD BEEN CLEANED UP. CHECK TWO ELECTRICAL OUTLETS THAT WERE BURIED UNDER DEBRIS AND POWER WAS OFF TO BOTH OF THEM. OWNER WAS GOING TO LEAVE WINDOWS OFF AND HAVE SOLID WALL COVERING THE OPENING. WASN'T SURE IF BRICK OR FRAMING WAS GOING TO BE USED. ADVISED THAT DRAWINGS AND AN ARCHITECT WILL BE REQUIRED TO GET THE PERMITS. THEY WILL NEED TO CHECK THE FOOTINGS IF GOING WITH BRICK DUE TO WEIGHT. HAD NO OTHER QUESTIONS AND LEFT SITE. WILL CHECK IN 30 DAYS. |