Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2006 | INITIAL CODE VIOLATION | Correction Required | LOC. OF DAMAGE: #6 TOTAL LOSS & #5 SMOKE DAMAGE BUILDING: EXTERIOR MASONRY CONST, NO DAMAGE INTERIOR - TOTAL RESTORATION NEEDED ELEC: ALL CIRCUITS TO #6 INCLUDING SERVICE PLUMBING: ALL PLUMBING TO BE EVALUATED #6 AND REPAIRED - #5 UNDAMAGED MECHANICAL: ALL MECH. IN #6 - #5 OK LICENSED CONTRACTOR TO CONDUCT REPAIRS - PERMITS REQUIRED - F.U. 5 DAYS |