Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/11/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* THIS IS NOT A REPIPE. IT IS ONLY A REPAIR FOR THIS REASON I MAY ALLOW THIS EXISTING LINE INSTALLED UNDER THIS BUILDING TO REMAIN IF NOTHING INSIDE HAS BEEN METERED FROM THE ORIGINAL INSTALLATION. 1. I NEED TO BE 100% SURE THAT NO LEAKS EXIST. 2. USE A GAUGE WITH 1/10 PSI INCREMENTATIONS TO ENSURE LINE TIGHTNESS WITHIN A REASONABLE AMOUNT OF TIME. 3. PRIME AND WRAP FITTINGS AND TOOL MARKS BELOW GRADE. PROVIDE ACCESS TO ALL GAS APPLIANCES. NOTE: WH VENT REQUIRES A CAP AGA VALVES REQUIRED ELECTRICAL BONDING REQUIRED ALL SAFETY DEVICES MUST BE IN PLACE AND OPERATIONAL. |