Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/26/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 11 PSI TEST NEW PIPING FROM METER TO WATER HEATER, WALL HEATER & STOVE OK |
|
| 02/15/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. COMPLETE GAS PIPING UP TO NEW VALVES AT WATER HEATER & FURNACE VALVES TO BE CSA OR AGA APPROVED. 2. PROVIDE BONDING OF BUILDING GAS PIPING. 3. PROVIDE CORRECT COMBUSTION AIR FOR WATER HEATERS 4. PIPING SHALL BE SECURED IN WALL AT STOVE DROP AND BE INSTALLED SO NO STRAIN IS ON PIPING WHEN WALL IS CLOSED UP. 5. WATER HEATERS SHALL BE IN WEATHERPROOF ENCLOSURES 6. NEW WATER HEATERS REQUIRE SEDIMENT TRAPS AT GAS ENTRY TO APPLIANCE. 7. VENTS FROM WATER HEATERS TO HAVE MINIMUM 1" CLEARANCE FROM COMBUSTIBLES AT ROOF LEVEL. 8. VENTS FROM WALL HEATERS TO BE MINIMUM 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH DOUBLE WALL VENT PIPING & CAP. THERE ARE (2) SEPARATE BUILDINGS. EACH BUILDING HAS (2) UNITS. A NEW GAS SYSTEM AND METER IS BEING ADDED TO EACH BUILDING FOR SEPARATE S.W GAS BILLING. A NEW WATER HEATER IS BEING ADDED TO EACH BUILDING ALONG WITH A EXISTING WATER HEATER (2) SEPARATE PERMITS FOR GAS PIPING & WATER HEATERS AT EACH ADDRESS ARE REQUIRED. ADDRESS IS TO BE POSTED ON EACH STRUCTURE WITH CORRECT ADDRESS ON EACH PERMIT. WATER HEATER ARE TO BE INSTALLED FOR GAS CLEARANCE CORRECTIONS AT THIS TIME ARE LISTED ON 5754 E 23RD ST INSPECTION SHEET. WATER PIPING IS ALTERED FOR SEPARATION OF HOT WATER SUPPLY TO EACH UNIT AT EACH BUILDING. THIS PIPING WILL NEED TO BE EXPOSED FOR INSPECTION AND SHALL BE FULL SIZE REQUIRED BY 2003 UPC. |