Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1. GATE LOCKED (I FOUND THE BUZZER) 2. PRESSURE TEST OK GAS TO FURNACE, WATER HEATER AND STOVE 3. OK FOR GAS UCC LEFT AT METER SW GAS 889-1888 |
|
| 12/20/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL SUPPORT HORIZONTAL VENT FOR FURNACE. 2. SHALL SUPPORT GAS PIPING CORRECTLY. 3. SHALL HAVE 1" MINIMUM CLEARANCE FROM COMBUSTIBLE AT FLASHING FOR VENT FROM WATER HEATER. 4. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL BE FUNCTIONAL. 5. IF A FUTURE TEE FOR AN APPLIANCE IS DESIRED A CITY APPROVED GAS ISOMETRIC OF YOUR GAS SYSTEM IS REQUIRED. 6. FIREPLACE VALVE SHALL NOT BE IN HEARTH, SHALL BE OUTSIDE OF HEARTH MAXIMUM 4' FROM HEARTH AND TESTED INTO HEARTH OF FIREPLACE. 7. PROVIDE CORRECT BONDING OF BUILDING GAS PIPING. |