Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 13.7 |
|
| 12/01/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. LESS THAN 4 PSI ON 30 PSI GAUGE IS NOT ACCEPTABLE. A 15 PSI GAUGE WITH 1/10 PSI INCREMENTATION IS REQUIRED BY CODE IN ORDER TO ASSURE LINE TIGHTNESS WITHIN A REASONABLE AMOUNT OF TIME. 2. WH VENT OPENING IS 3" YOU MAY USE A 4" VENT IF YOU USE THE PROPER FITTING B VENT REQUIRES 1" OF CLEARANCE FROM COMBUSTIBLES. SECURE VENT CONNECTORS W/GALV SHEET METAL SCREWS. 3. SEDIMENT TRAP REQUIRED AT WH 4. T&P SHALL BE OPERATIONAL. 5. FUTURE TEES IN GAS SYSTEM ARE NOT ALLOWED UNLESS SPECIFICALLY NOTED ON APPROVED CITY PLAN. PROVIDE PLAN OR REMOVE TEE. 6. IF YOU WILL INSTALL HOSE BIB VACUUM BREAKERS ON YOUR NEW WATER PIPING, I WON'T ASK FOR A PERMIT FOR YOUR WATER REPIPE. ALSO, SECURE WATER PIPING AT WH |
|
| 11/30/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* TOOL MARKS ON SCOTCH KOTE WH VENT, T&P TO BE COMPLETE, SEDIMENT TRAP ELECTRICAL BONDING TEST GAUGE GAS TO WH AND STOVE ONLY |