Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/09/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SOAP TEST EXPOSED LEAK AT FLEX NUT AT VALVE TO AC UNIT 1. REPAIR THIS LEAK |
|
| 01/09/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLETE YOUR GAS PIPING TO ROOFTOP UNIT GAS VALVE TO BE WITHIN 3' OF VENT, SEE NOTE #1 FROM 12/5/06 INSPECTION & PROVIDE AIR TEST ON ADDITIONAL PIPING FROM EXISTING GAS VALVE ON ROOF. CONNECTION TO EXISTING OK WHEN ACCESS PANEL IS INSTALLED. |
|
| 12/05/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE PERMANENT ROOFTOP SUPPORT FOR GAS PIPING FOR ROOFTOP UNIT WITH GAS FLEX APPROVED FOR 100,000 BTU UNIT. 2. SHALL SEE FINAL CONNECTION TO EXISTING AFTER CHANGE OVER IS MADE PER NOTE #3 11/30/06 WITH ROOFTOP UNIT INSTALLED. |