Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06PL02160

Parcel: 134111010

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
12/07/2006 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
12/06/2006 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
12/04/2006 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
1. PROVIDE ROOF JACK ON PIPING PENETRATION THRU ROOF
2. PROVIDE CORRECT SUPPORT & SECURE ROOFTOP GAS PIPING.
3. SHALL PROVIDE AGA OR CSA APPROVED GAS SHUT OFF VALVES AT ALL APPLIANCES WITH GAS FLEX RATED FOR BTU'S OF APPLIANCE.
4. FUTURE TEES REQUIRE APPROVED GAS ISOMETRIC PLANS BY CITY OR SHALL BE REMOVED FROM SYSTEM.
5. SUPPORT GAS PIPING AT WATER HEATER LOCATION & DOOR LOCATION.
6. PROVIDE BONDING OF BUILDING GAS PIPING.
7. WATER HEATER TO HAVE COMPLETE CONNECTION FOR VENT AND T&P DEVICE.

SEAL PIPE ENTRY INTO BUILDING.