Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/30/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 30 PSI GAUGE HAS 18 PSI, IF 18 PSI IS STILL HOLDING AT TIME OF REINSPECTION THEN I WILL ACCEPT TEST. THE 1/10 PSI INCREMENTATION REQUIREMENT IS IN PLACE TO ENSURE LINE TIGHTNESS WITHIN A REASONABLE AMOUNT OF TIME. SUPPORT PIPE W/PIPE CLAMPS NOT CONDUIT CLAMPS. ALSO, 2 HOLE CLAMPS ARE OK WHEN PIPING IS AGAINST A SURFACE, WHEN PIPING IS AWAY FROM WALL OTHER TYPES OF SUPPORTS ARE NEEDED. SECURE SUPPORTS ON ROOF NEAR UNITS W/TAR TO PREVENT DEBRIS LEFT ON ROOF FROM THIS JOB. |
|
| 11/22/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE TEST GAUGE IN 1/10TH POUND INCREMENTS 2) PIPE TO SHUT OFF VALVE LOCATION FOR NORTH UNIT AND SUPPORT ALL PIPING AT CORRECT INTERVALS 3) PROVIDE AGA OR CSA APPROVED GAS VALVES AN FLEXES AS REQUIRED 4) PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO APPLIANCES |