Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06PL02123

Parcel: 13316005K

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
12/05/2006 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
11/30/2006 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
30 PSI GAUGE HAS 18 PSI, IF 18 PSI IS STILL HOLDING AT TIME OF REINSPECTION THEN I WILL ACCEPT TEST. THE 1/10 PSI INCREMENTATION REQUIREMENT IS IN PLACE TO ENSURE LINE TIGHTNESS WITHIN A REASONABLE AMOUNT OF TIME.

SUPPORT PIPE W/PIPE CLAMPS NOT CONDUIT CLAMPS. ALSO, 2 HOLE CLAMPS ARE OK WHEN PIPING IS AGAINST A SURFACE, WHEN PIPING IS AWAY FROM WALL OTHER TYPES OF SUPPORTS ARE NEEDED.

SECURE SUPPORTS ON ROOF NEAR UNITS W/TAR TO PREVENT DEBRIS LEFT ON ROOF FROM THIS JOB.
11/22/2006 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) PROVIDE TEST GAUGE IN 1/10TH POUND INCREMENTS
2) PIPE TO SHUT OFF VALVE LOCATION FOR NORTH UNIT AND SUPPORT ALL PIPING AT CORRECT INTERVALS
3) PROVIDE AGA OR CSA APPROVED GAS VALVES AN FLEXES AS REQUIRED
4) PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO APPLIANCES