Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) PIPING APPEARS TO HAVE BEEN INSTALLED TO THE MINIMUM STANDARDS REQUIRED BY THE UPC. IT IS THE CONTRACTORS RESPONSIBILITY TO ASSURE THAT ALL PROCEEDURES REQUIRED HAVE BEEN ADHERED TO |
|
| 11/21/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |