Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1) 15 PSI TEST ENTIRE GAS SYSTEM TO BLDG, WATER HEATER, FURNACE, COOK TOP, LOG LIGHTER OK 2) METER IS ON, CONTRACTOR RESPONSIBLE FOR CONNECTIONS AND VERIFICATION OF NO GAS LEAKAGE |
|
| 11/17/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |