Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 11:13 NO ACCESS SHALL HAVE AN ADULT PRESENT TO PROVIDE ACCESS. PLEASE READ & COMPLY WITH ALL ITEMS ON THIS SHEET OR YOU COULD BE REFEE'D |
|
| 11/29/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* MR. WILCOX 488-8754 MIKE; CUMMINGS 631-0312 AFTER HRS. GAS INSP. PAID FOR BY CUMMINGS PLUMBING W/CHK #03003 FAX PETITION OF APPEAL FORM TO BRIAN @ 791-3205 SECURE VENT W/3 SCREWS AT WH CONNECTION INSTALL HB VAC BREAKER AT PRV LOCATION (HB IS NEW) OK FOR GAS CALL SW GAS AT 889-1888 |
|
| 11/20/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - BOTH GAUGES ARE READING 0, THERE MAY BE A LEAK, CHECK FOR LEAKS AND RETEST. - ALSO, PROVIDE REQUESTED DOCUMENTATION. - STUB OUT FOR STOVE SHALL STUB OUT PERPENDICULAR TO WALL TO ALLOW FOR WALL REPAIR THEN OFFSET FOR STOVE CLEARANCE. - NEW HOSE BIB AT PRV LOCATION REQUIRES A VACUUM BREAKER. |
|
| 11/16/2006 | PLUMBING - FINAL | Denied | HAVE PLAN REVISED TO SHOW MATERIAL TYPE IF USING CSST. ADD REPLACE WH TO PERMIT. PROVIDE A PETITION OF APPEAL FOR T&P TERMINATION. TERMINATE PRV 1" ABOVE PLANTER. SECURE PIPE ABOVE ROOF. SECURE STUB OUT AT STOVE, CLAMP RIDGID PIPING. PROVIDE A LADDER TO ACCESS ATTIC. PROVIDE AGA VALVE AND TEST GAS TO POOL HEATER. |