Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS MADE OK OK FOR GAS UCC LEFT AT METER SET |
|
| 11/09/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE ROOF FLASHINGS AT PENETRATION THRU ROOF FOR GAS PIPING. 2. IF A FUTURE TEE ON ROOF IS DESIRED A CITY APPROVED GAS ISOMETRIC IS REQUIRED. 3. VENT FROM WATER HEATER & FURNACE TO BE MADE UP CORRECTLY BE DOUBLE WALL THRU ROOF AND TERMINATE 2' ABOVE TOP OF COLER WHEN WITHIN 10' OF INTAKE WITH APPROVED VENT CAP. 4. PIPING ON ROOF TO BE 3 1/2" MINIMUM ABOVE ROOF LINE SUPPORTED AT CORRECT INTERVALS WITH WEATHERPROOF MATERIAL AND SECURED TO SUPPORTS. 5. PROVIDE BONDING OF BUILDING GAS PIPING. |