Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/08/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE MINIMUM TEST AT TIME OF INSPECTION TO HOLD WITH NO PRESSURE LOSS 2) GAS PIPING TO BE SECURED AT CORRECT INTERVALS AND BE 6" MINIMUM ABOVE GRADE AT METER AREA 3) REMOVE FUTURE TOE CONNECTION AT METER LOCATION OR PROVIDE CITY APPROVED GAS ISOMETRIC FOR THIS CONNECTION 4) SHALL PROVIDE BONDING OF BLDG GAS PIPING 5) GAS PIPING TO HAVE ROOF FLASHING THRU ROOF AND BE PROPERLY SUPPORTED ON ROOF |