Permit: T06PL01984

Parcel: 125115260


Addresses:

3630 E 3RD ST


Inspection Status: Approved

Inspection History: SITE - SEWER

Permit Number - T06PL01984

Inspection Description - SITE - SEWER

Inspection Status - Approved

Date Description Inspector Results Comments
05/04/2007 SITE - SEWER Approved IVRS - Inspection :*
01/29/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
GREGOR ENGINEERING WILL TEST PRIVATE MANHOLE AND SUBMIT ALL TESTING RESULTS TO PCDEQ FOR REVIEW
DO NOT CONNECT INDIVIDUAL HCS CONNECTIONS
UNTIL AFTER PCDEQ GIVES PERMISSION TO DISCHARGE AND C.O.T HAS FINALED THE PRIVATE SEWER.
01/24/2007 SITE - SEWER Partial Approval IVRS - Inspection :*
1. REP FOR PCWV
GREGOR ENGINEERING
OLLANIK CONST.
2. REVIEWED PCDEQ REQUIREMENT FOR VACUUM TESTING MANHOLES.
01/23/2007 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
01/22/2007 SITE - SEWER Cancelled CANCELLED PER WARREN OF OLANIK CONST. #260-0047
12/28/2006 SITE - SEWER Partial Approval IVRS - Inspection :*
LOW PRESSURE AIR TEST FROM PUBLIC MH#1 TO
PRIVATE MH#2 AND FROM PRIVATE MH#2 TO PRIVATE MH#3
12/13/2006 SITE - SEWER Partial Approval IVRS - Inspection :*
REVIEWED INSTALLATION STANDARD FOR
SEWER/SITE WATER
12/11/2006 SITE - SEWER Partial Approval IVRS - Inspection :*
1. ALL OF THE HCS LATERALS ARE NOW INSTALLED
REDLINE INVERTS TO FOLLOW
2. OK TO COVER - SUBJECT TO TESTS AND VERIFICATION OF GRADE.
12/10/2006 SITE - SEWER Partial Approval IVRS - Inspection :*
1. MH #3 BASE POURED
2. 4" ABS LATERALS BEING INSTALLED
DON'T FORGET TO REDLINE INVERTS
12/07/2006 SITE - SEWER Partial Approval IVRS - Inspection :*
6" DIP MAIN STILL BEING INSTALLED
4" ABS LATERALS -- REDLINE INVERTS
12/06/2006 SITE - SEWER Partial Approval IVRS - Inspection :*
6" DIP SEWER WITH WYE BRANCH HCS CONNECTIONS
DIP X 51 CONNECTION MADE AT WYE
TRACER CONNECTED TO DIP
11/23/2006 SITE - SEWER Partial Approval IVRS - Inspection :*
1) REVIEWED INSTALLATION DESIGN AND APPROVED 1P WYE WITH 45 DEGREEE AND TRANSITION TO ABS PER ENGINEERS APPROVAL
11/17/2006 SITE - SEWER Not ready for Inspection PCWWM JAIME RIVERA - ENGINEER
ILENE DECKARD CEA
ROY MONTAYA

1. DURING THE PRE-CON MEETING IT WAS AGREED THAT A D.I.P TEE WITH A 95 DEG. ELL AT A 45 DEG. ANGLE WOULD CLOSELY APPROXIMATE DETAIL 401 (IN LIEU OF A DRAINAGE TYPE FITTING) TAPPING OF A 4" HCS ON 6" WAS NOT DISCUSSED. THERE IS NO PROBLEM WITH USING A TAPPING SADDLE THE PROBLEM IS TAPPING 4" ON 6" PIPE.
2. THIS IS A PRIVATE SEWER WHICH REQUIRES DRAINAGE FITTINGS D.I.P DOES NOT MAKE DRAINAGE FITTINGS. I AGREED TO THE USE OF DIP TEE AS A REASONABLE ALTERNATIVE (NOT TAPPING).
11/13/2006 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
YOU MAY NOT TAPE 4" ON 6"
11/09/2006 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
11/08/2006 SITE - SEWER Partial Approval IVRS - Inspection :*
1. DIP X PVC CONNECTION MADE OK
DIP BEING INSTALLED OK
RECALL AS PROGRESS CONTINUES.