Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/25/2006 | PLUMBING - FINAL | Cancelled | IVRS - RI canceled | |
| 10/24/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PROVIDE 90 DEG. DOWN TERMINATION FOR WATER HEATER T&P WITH DRY WELL FILLED WITH ROCK TO KEEP MUD OUT. |
|
| 10/20/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. REMOVE TAPE AT SINGLE TO DOUBLE WALL VENT CONNECTOR DRAFT SPACE. AT FURNACE PROVIDE 3-GALV SCREWS AT ALL VENT CONNECTORS. 2. PROVIDE CORRECT VENT SECTIONS AT OUTLET OF FURNACE TO DOUBLE WALL VENT THRU REDLINE. 3. EXPOSE WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN TERMINATION TO VERIFY CORRECT TERMINATION. |