Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2006 | PLUMBING - FINAL | Approved | ||
| 10/03/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE T&P DRAIN FOR WATER HEATER GRAVITY DRAIN TO DAYLIGHT. 2. PROVIDE CORRECT VENTING FOR FURNACE, WATER HEATER. 3. GAS PIPING TO BE 3" MINIMUM ABOVE GRADE AND SECURED PROPERLY. 4. PROVIDE BONDING OF BUILDING GAS PIPING. BONDING CLAMPS & #4 COPPER WIRES. 5. TEST TO HOLD WITH NO PRESSURE LOSS. |