Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/13/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* USE BACK DOOR PARK ON NORTHSIDE - STAND NOT LISTED FOR WH. STAND NOT REQUIRED. - SECURE EXPANSION TANK - EXTEND DOUBLE WALL B VENT 6" OUT FROM INTERIOR WALL - NO TAPE AT VENT CONNECTOR TO B VENT CONNECTION, SECURE WITH SCREWS. - VENT TERMINATION IS OK |
|
| 10/05/2006 | PLUMBING - FINAL | Denied | 1. IF A STAND IS USED IT SHALL BE LISTED AND WATER HEATER LOGS SHALL REST ON STAND. 2. INSTALL SEDIMENT TRAP AT GAS ENTRY TO WATER HEATER. AND READ WARNING LABEL & COMPLY. 3. PROVIDE EXPANSION TANK OR APPROVED MEANS OF EXPANSION BECAUSE BUILDING SUPPLY HAS REDUCED PRESSURE PRINCIPAL BACKFLOW DEVICE. 4. IF YOU USE DOUBLE WALL VENT PIPING IT SHALL REMAIN DOUBLE WALL TO POINT OF TERMINATION WITH APPROVED VENT CAP. NOTE: DOUBLE WALL VENT PIPING IS REQUIRED THRU WALL & ROOF AND IF ANY COMBUSTIBLES ARE WITHIN 1" & OF VENT PIPING. 5. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT EXPOSE THIS LOCATION. 6. CONTRACTOR TO PROVIDE ROOFTOP ACCESS AT REINSPECTION. |