Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SEE NOTE FIVE ABOVE. PLUMBER HAS VALVES ON SITE. 2. BOND SHALL BE #10 COPPER WIRE 3. REMOVE SOILS FROM TRENCH AND SHADE WITH CLEAN FILL. |
|
| 09/27/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS MADE OK OK FOR GAS SW GAS 889-1888 |
|
| 09/22/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. GAS SYSTEM SHALL BE TESTED IN ITS ENTIRETY. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN TO TERMINATE 6"-24" FROM FINISHED GRADE. 3. WATER HEATER SHALL HAVE WEATHER PROOF ENCLOSURE. 4. VENT FROM WATER HEATER TO BE DOUBLE WALL WHERE IT LEAVES ENCLOSURE, DOUBLE WALL THRU ROOF INSTALLED IN DIRECTION PER MANUFACTURER INSTALLATION INSTRUCTIONS WITH APPROVED VENT CAP. AND SHALL BE MINIMUM 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE. 5. SHALL PROVIDE APPROVED GAS SHUT OFF VALVES AT ALL APPLIANCES (AGA OR CSA). 6. REMOVE TAPE AT SINGLE TO DOUBLE WALL VENT CONNECTION FOR FURNACE DRAFT SPACE. 7. PROVIDE BONDING OF BUILDING GAS PIPING. 8. FURNACE VENT TO BE DOUBLE WALL FULL SIZE VENT PIPING THRU ROOM MINIMUM 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH APPROVED FULL SIZE VENT CAP. |