Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK 2) OK FOR GAS 3) OK TO BACKFILL |
|
| 04/20/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) INSTALL APPROVED COUPLING AT U.G. GAS 2) REQUIRE TEN POUND TEST 3) BOND GAS TO WATER |
|
| 04/12/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) UNDERGROUND GAS PIPING COVERED WITHOUT INSPECTION 2) ROOF TOP GAS NOT SECURED-NO FLASHINGS 3) WATER HEATER REMOVED-NEW WATER HEATER REQUIRES PERMIT 4) HOUSE IS BEING REMODELED, WHERE ARE YOUR PERMITS ? 5) NEW SINK IN LIVING ROOM-REQUIRES PLAN AND NEW SHOWER REQUIRES SHOWER PAN INSPECTION 6) NO TEST ON GAS 7) MAKE ALL CORRECTIONS FROM 12/12/06 AND SECURE PERMITS FOR UNPERMITTED WORK & RECALL FOR INSPECTION |
|
| 12/12/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE PIPE PRIMER THEN TAPE ALL UNDERGROUND FITTINGS & TOOL MARKS TO 6" ABOVE FINISH GRADE. 2. SHALL PROVIDE APPROVED COUPLINGS. 3. PROVIDE FIRM BEDDING FOR UNDERGROUND PIPING. 4. SECURE ALL GAS PIPING. 5. PROVIDE SEDIMENT TRAP AT GAS ENTRY TO WATER HEATER. 6. WATER HEATER T&P DRAIN SHALL GRAVITY DRAIN TO DAYLIGHT TERMINATING WITH 90 DEG. DOWN ON EXTERIOR. 7. PROVIDE BONDING OF BUILDING GAS PIPING. 8. PROVIDE FLASHING THRU ROOF FOR GAS PIPE. 9. PROVIDE APPROVED VENT CAPS FOR WATER HEATER & FURNACE. RETEST & CALL IN |