Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/28/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE BONDING OF BUILDING GAS PIPING. 2. REMOVE DUCT TAPE FROM WATER HEATER VENT & PROVIDE 3-GALV SCREWS AT EACH JOINT OF WATER HEATER VENT & FURNACE VENT. 3. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN SHALL GRAVITY DRAIN TO DAYLIGHT AND TERMINATE AT 90 DEG. DOWN ON EXTERIOR. 4. PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO WATER HEATER & FURNACE. 5. CAP OLD GAS PIPING ON INTERIOR. |